COMMISSIONING

Completed Projects - Partial List
Toyota Motor Sales, USA, Torrance, CA
Toyota Motor Sales, USA
Toyota Motor Sales, USA opened their first LEED certified facility, located in Torrance, California on Earth Day (April 22nd) 2003. At that time, the 684,000 square foot building was the largest facility to achieve LEED Gold and finished with a remarkable total of 45 LEED points. More...
Smart Corner, San Diego, CA
Smart Corner
Smart Corner, a multi-developer collaboration built on previously developed land in urban downtown San Diego, achieved a LEED Silver rating in April of 2007. The project features live-work amenities and is directly connected to a new light-rail station. More...
Applied Biosystems, Pleasanton, CA
Applied Biosystems
The Applied Biosystems laboratory and commercial office building was the first project in San Jose to achieve LEED certification. The 100,000 square foot building was completed in May 2003 and the project achieved a LEED Silver rating. More...
Sidney E. Frank Hall for Life Sciences, Providence, RI
Sidney E. Frank Hall for Life Sciences
The Sydney E. Frank Hall for Life Sciences is Brown University’s largest capital project to date. The $95-million, five-story, 170,000 square foot Life Sciences building houses 30 laboratories, 62 offices, conference rooms and a seminar room. More...
Inland Empire Utilities Agency Headquarters, Chino, CA
Inland Empire Utilities Agency Headquarters
Conducted LEED fundamental building systems commissioning and additional commissioning services, including a post occupancy re-commissioning of building's mechanical and electrical systems. More...
Los Angeles Audubon Nature Center , Los Angeles, CA
Los Angeles Audubon Nature Center
The Audubon Center at Debs Park uses only power generated on site, meaning the facility operates entirely off-grid. The Center is designed to use 70% less water than a comparable conventional building, and to treat all wastewater on site. More than 50% of the building materials were manufactured locally, and more than 97% of construction debris was recycled. More...
Natural Resources Defense Council, Santa Monica, CA
Natural Resources Defense Council
The Southern California office for the NRDC is located in a renovated 1920s structure in Santa Monica. CTG assisted with selection of architects, performed an analysis of existing energy usage, established sustainable design guidelines, and assisted throughout the design and construction of the facility. More...
The William & Flora Hewlett Foundation, Menlo Park, CA
The William & Flora Hewlett Foundation
Managed the commissioning process, conducted an alternative energy generation study, and developed a monitoring and verification plan. More...
Premier Automotive Group, North American Headquarters, Irvine, CA
Premier Automotive Group, North American Headquarters
Commissioned building systems: chilled water plant, heating hot water plant, energy management control system, air handling systems, underfloor air distribution system, 200kW fuel cell installation and related heat recovery. More...
Los Angeles Fire Facilities , Los Angeles, CA
Los Angeles Fire Facilities
Conducting sustainability, LEED fundamental building systems commissioning and peer review services for eleven new facilities expected to be completed in 2007. More...
Hayward Truss Yard, Santa Maria, CA
Hayward Truss Yard
Managed the commissioning process and developed a monitoring and verification plan. More...
Uptown Oakland, Oakland, CA
Uptown Oakland
Uptown Oakland is a 918,000 square foot mixed-income housing development consisting of more than 650 residential rental units. The project incorporates a number of sustainable design features, such as natural ventilation, high efficiency central domestic hot water system and a thermally-efficient building envelope that includes a cool roof. Located on a former brownfield site, this project is part of recent efforts by the city of Oakland to revitalize the downtown area. More...
Symantec Culver City, Culver City, CA
Symantec Culver City
The Symantec Culver City office complex is a new construction project comprising 497,000 square feet of office space and a six-level parking structure. Principles of sustainability have been incorporated throughout the design and construction of the building, and the project has achieved a LEED-NC v2.1 Gold rating. The project features an advanced under floor ventilation system designed to deliver optimal thermal comfort control for building occupants. More...
Interior Office Solutions, Irvine, CA
Interior Office Solutions
The Interior Office Solutions office space and furniture showroom is a new construction project comprising 10,000 square feet of retail space. The project makes extensive use of low-emitting materials for such items as carpet, paint, furniture, and composite wood products. More...
999 Corporate Drive, Ladera Ranch, CA
999 Corporate Drive
Project owner Rancho Mission Viejo Company collaborated with Lutzky Development, who developed the project , to build a green building with a positive impact on its occupants and on the broader Ladera Ranch community. This 40,000 square foot office building is the first LEED certified building in Ladera Ranch, an upscale community in South Orange County. More...
Pitzer College New Residence Halls – Phase I, Claremont, CA
Pitzer College New Residence Halls – Phase I
Phase I of the New Residence Halls project at Pitzer College consists of three multi-level residence halls and a multi-use building housing classrooms and art & music facilities. More...
California Academy of Sciences, San Francisco, CA
California Academy of Sciences
CTG is serving as the commissioning agent for the new California Academy of Sciences in San Francisco. Designed by the renowned Renzo Piano Building Workshop, the new facility is the first museum to achieve the LEED Platinum rating. More...
Environmental Nature Center, Newport Beach, CA
Environmental Nature Center
The Environmental Nature Center in Newport Beach, CA is the first LEED Platinum project in Orange County. The facility features extensive use of solar technology which provides 100% of the building's power needs. More...
5600 Wilshire Boulevard, Los Angeles, CA
5600 Wilshire Boulevard
BRE properties, Inc. opened 5600 Wilshire in fall 2008. The 248-unit apartment complex in downtown Los Angeles includes over 244,000 square feet in a 4-6 story complex. The development also incorporates retail and restaurant space in addition to common amenities such as three-level parking structure, fitness and recreation rooms, and outdoor pool. More...
Century Prosper Center Commissioning, Beijing, China
Century Prosper Center Commissioning
CTG provided commissioning services in support of the Century Prosper Center in Beijing, China which included both commercial and office building space. More...
Otis Elevator Factory , Tianjin China
Otis Elevator Factory
CTG provided executive commissioning and M&V for the UTC Otis Elevator office building and elevator factory in Tianjin, China. More...
Commissioning Agent Training Session, Dubai, United Arab Emirates
Commissioning Agent Training Session
CTG contracted with Environmental Market Solutions, Inc. (ESMI) to conduct a Commissioning Agent (CxA) training session focused on developing a building commissioning approach and action plan consistent with requirements set forth by the Middle East Center for Sustainable Development (MECSD). More...